Value at Risk Calculator
Test cases replayed : 3 of 3 match · Methodology · No outside source listed
Value at risk estimates the loss a portfolio should not exceed, at a chosen confidence level, over a set number of days, if returns are normal.
Result
Value at risk
Z value
- VaR as % of the portfolio
Estimate for planning only, not tax, legal, financial or medical advice. This calculator uses the method explained on this page.
This browser did not allow copying. The sentence is in the box below, already selected: copy it with your keyboard or the menu.
How to use this calculator
Fill in the fields in this order; each step takes you to its field.
- Portfolio value, in dollars: enter 0.01 or more.
- Daily volatility, standard deviation of daily returns, in percent: enter 0 or more.
- Confidence level: choose 90%, 95%, 97.5% or 99%.
- Holding period (trading days): enter 1 or more.
- Read the result: Value at risk; the panel also shows Z value and VaR as % of the portfolio.
How this calculator works
Parametric (variance-covariance) VaR = V × Z × σ × √T, where V is the portfolio value, Z the standard normal quantile of the confidence level (1.6449 at 95%, 2.3263 at 99%), σ the standard deviation of daily returns and T the holding period in days.
The √T scaling assumes independent daily returns with zero mean. VaR does not say how large a loss can be beyond the threshold, and real returns have fatter tails than the normal law; it is a risk estimate, not investment advice.
The formula
| Symbol | Meaning | Unit |
|---|---|---|
| Portfolio value | $ | |
| Daily volatility, standard deviation of daily returns | % | |
| Confidence level | ||
| Holding period (trading days) | ||
| Z value | ||
| Value at risk | $ | |
norminv(p, m, s) | the value that a Gaussian variable with mean m and standard deviation s stays at or below with probability p (mean zero and standard deviation one without m and s). |
Worked example
| Portfolio value | $1,000,000 |
|---|---|
| Daily volatility, standard deviation of daily returns | 1.5% |
| Confidence level | 95% |
| Holding period (trading days) | 10 |
| Z value | 1.6449 |
|---|---|
| VaR as % of the portfolio | 7.8% |
Value at risk $78,022
Each step uses the unrounded value of the step before it; figures on this page are rounded for display.
Frequently asked questions
How do you calculate 1-day 95% VaR?
Multiply value by 1.6449 and the daily volatility: $1,000,000 × 1.6449 × 1.5% = $24,673.
How does VaR scale with time?
With the square root of the number of days: the 10-day 95% VaR of the same portfolio is $78,022.
What does a 99% VaR of $X mean?
In the model, losses over the period should exceed $X on only 1% of occasions.