Concrete Block Fill Calculator
Test cases replayed : 2 of 2 match · Methodology · No outside source listed
Enter the wall size, the actual size of your blocks and how many cells you fill to get the core-fill volume in cubic feet, yards and bags.
Result
Fill with wastecu yd
Blocks in the wall
- Core volume per block (cubic feet)
- Fill with waste (cubic feet)
- Premix bags if mixed from bags
The unit choice applies to the fields you fill in. Results stay in the units written with them.
Estimate for planning only, not tax, legal, financial or medical advice. This calculator uses the method explained on this page.
This browser did not allow copying. The sentence is in the box below, already selected: copy it with your keyboard or the menu.
Affiliate link
This is an affiliate link. As an Amazon Associate I earn from qualifying purchases. This does not change the result.
Search Amazon for concrete mix and concrete tools. Visit Amazon
How to use this calculator
Fill in the fields in this order; each step takes you to its field.
- Units: switches the fields between the two unit systems.
- Wall length, in ft: enter 0 or more.
- Wall height, in ft: enter 0 or more.
- Block length, actual (example value; use your block's data sheet), in in: enter 1 or more.
- Block height, actual (example value; use your block's data sheet), in in: enter 1 or more.
- Mortar joint (example value), in in: enter a number from 0 to 1.
- Block width, actual (example value; use your block's data sheet), in in: enter 0.5 or more.
- Percent solid of the block (from the manufacturer, example): enter a number from 0 to 100.
- Share of cells filled, in percent: enter a number from 0 to 100.
- Waste allowance, in percent: enter a number from 0 to 50.
- Bag yield (cubic feet per bag; typical value, use the figure printed on your bag): enter 0.01 or more.
- Read the result: Fill with waste; the panel also shows Blocks in the wall, Core volume per block (cubic feet), Fill with waste (cubic feet) and Premix bags if mixed from bags.
How this calculator works
Each block with its joint covers (length + joint) × (height + joint) square inches of wall, so blocks = wall area (sq ft) × 144 ÷ that face.
Core volume per block = the block's gross volume (length × height × width, actual) × (1 − percent solid ÷ 100). The percent solid comes from the block's data sheet. Multiply by the share of cells you fill, then the waste allowance.
The formula
| Symbol | Meaning | Unit |
|---|---|---|
| Wall length | ft | |
| Wall height | ft | |
| Block length, actual (example value; use your block's data sheet) | in | |
| Block height, actual (example value; use your block's data sheet) | in | |
| Mortar joint (example value) | in | |
| Block width, actual (example value; use your block's data sheet) | in | |
| Percent solid of the block (from the manufacturer, example) | ||
| Share of cells filled | % | |
| Waste allowance | % | |
| Blocks in the wall | ||
| Core volume per block | cubic feet | |
| Fill with waste | cubic feet | |
| Fill with waste | cu yd | |
ceil(x) | the smallest whole number not below x. |
Worked example
| Wall length | 40 ft |
|---|---|
| Wall height | 4 ft |
| Block length, actual (example value; use your block's data sheet) | 15.625 in |
| Block height, actual (example value; use your block's data sheet) | 7.625 in |
| Mortar joint (example value) | 0.375 in |
| Block width, actual (example value; use your block's data sheet) | 7.625 in |
| Percent solid of the block (from the manufacturer, example) | 52 |
| Share of cells filled | 100% |
| Waste allowance | 5% |
| Bag yield (cubic feet per bag; typical value, use the figure printed on your bag) | 0.6 |
| Blocks in the wall | 180 |
|---|---|
| Core volume per block (cubic feet) | 0.2523 |
| Fill with waste (cubic feet) | 47.69 |
| Premix bags if mixed from bags | 80 |
Fill with waste 1.77 cu yd
Each step uses the unrounded value of the step before it; figures on this page are rounded for display.
Frequently asked questions
How much grout fills one 8-inch block?
At 52% solid, 15.625 × 7.625 × 7.625 × 0.48 ÷ 1,728 = 0.2523 cubic feet per block.
Do I have to fill every cell?
Not always. Engineered walls often grout only cells with rebar; follow the plans or your local code.