Cycle Time Calculator
Test cases replayed : 2 of 2 match · Methodology · No outside source listed
Enter the production time, the downtime in that period and the number of good units made.
Result
Cycle time (minutes per unit)
Net production time (minutes)
- Cycle time (seconds per unit)
- Units per hour
Estimate for planning only, not tax, legal, financial or medical advice. This calculator uses the method explained on this page.
This browser did not allow copying. The sentence is in the box below, already selected: copy it with your keyboard or the menu.
How to use this calculator
Fill in the fields in this order; each step takes you to its field.
- Production time, in minutes: enter 0 or more.
- Downtime and breaks, in minutes: enter 0 or more.
- Units produced: enter 1 or more.
- Read the result: Cycle time (minutes per unit); the panel also shows Net production time (minutes), Cycle time (seconds per unit) and Units per hour.
How this calculator works
Average cycle time = net production time ÷ units produced, where net production time = scheduled time − downtime and breaks. Units per hour = units ÷ net hours.
Cycle time is what the process actually achieves; takt time (available time ÷ customer demand) is the pace it must keep. A cycle time longer than takt means demand is not met.
The formula
| Symbol | Meaning | Unit |
|---|---|---|
| Production time | minutes | |
| Downtime and breaks | minutes | |
| Units produced | ||
| Net production time | minutes | |
| Cycle time | minutes per unit |
Worked example
| Production time | 480 minutes |
|---|---|
| Downtime and breaks | 30 minutes |
| Units produced | 225 |
| Net production time (minutes) | 450 |
|---|---|
| Cycle time (seconds per unit) | 120.0 |
| Units per hour | 30.0 |
Cycle time (minutes per unit) 2.00
Each step uses the unrounded value of the step before it; figures on this page are rounded for display.
Frequently asked questions
What is the cycle time for 225 units in an 8-hour shift with 30 minutes of downtime?
450 ÷ 225 = 2.00 minutes (120 seconds) per unit, or 30.0 units an hour.
What is the difference between cycle time and takt time?
Cycle time measures how long a unit actually takes; takt time is how often one must be finished to match demand.