Safety Stock Calculator

Test cases replayed : 2 of 2 match · Methodology · No outside source listed

Set the buffer stock that covers demand swings during the supplier lead time at the service level you choose.

Result

Sample figures

Safety stock (units)—

Service factor Z —

  • Reorder point (units)—

Estimate for planning only, not tax, legal, financial or medical advice. This calculator uses the method explained on this page.

Safety Stock Calculator

Target cycle service level, in percent: enter a number from 50 to 99.99. Prefilled example: 95.

Average daily demand (units): enter 0 or more. Prefilled example: 40.

Standard deviation of daily demand (units): enter 0 or more. Prefilled example: 10.

Lead time, in days: enter 0 or more. Prefilled example: 9.

How to use this calculator

Fill in the fields in this order; each step takes you to its field.

  1. Target cycle service level, in percent: enter a number from 50 to 99.99.
  2. Average daily demand (units): enter 0 or more.
  3. Standard deviation of daily demand (units): enter 0 or more.
  4. Lead time, in days: enter 0 or more.
  5. Read the result: Safety stock (units); the panel also shows Service factor Z and Reorder point (units).

How this calculator works

Safety stock = Z × σd × √L, where σd is the standard deviation of daily demand, L the lead time in days and Z the standard normal value whose cumulative probability equals the target cycle service level (Z = 1.6449 at 95%).

Reorder point = average daily demand × lead time + safety stock. This is the standard model for normally distributed demand and a fixed lead time; round the units up when you order.

The formula

  1. Z=norminv⁡(sl100,0,1)
  2. Ss=Z×sd×lt
Symbols used in the formula
SymbolMeaningUnit
slTarget cycle service level%
sdStandard deviation of daily demandunits
ltLead timedays
ZService factor Z
SsSafety stockunits
norminv(p, m, s)the value that a Gaussian variable with mean m and standard deviation s stays at or below with probability p (mean zero and standard deviation one without m and s).

Worked example

Target cycle service level95%
Average daily demand (units)40
Standard deviation of daily demand (units)10
Lead time9 days
Service factor Z1.6449
Reorder point (units)409.3
  1. Z=norminv⁡(95100,0,1)=1.64485
  2. Ss=1.64485×10×9=49.3456

Safety stock (units) 49.3

Each step uses the unrounded value of the step before it; figures on this page are rounded for display.

Frequently asked questions

How do you calculate safety stock?

Multiply the Z value of your service level by the demand standard deviation and the square root of the lead time. At 95%, 10 units of daily deviation and 9 days: 1.6449 × 10 × 3 = 49.3 units.

What is the reorder point with safety stock?

Expected demand during the lead time plus safety stock: 40 × 9 + 49.3 = 409.3 units in the example.

Why does safety stock grow so fast near 100%?

Z rises steeply: about 1.64 at 95% and 2.33 at 99%, so the last points of service level cost the most inventory.