Skip to content
FiftyCalc Free calculators for all 50 states

Reorder Point Calculator

Test cases replayed : 2 of 2 match · Methodology · No outside source listed

Enter your average daily sales, the supplier's lead time and your safety stock to get the reorder point.

Result

Sample figures

Reorder point (units)—

Demand during lead time (units) —

Estimate for planning only, not tax, legal, financial or medical advice. This calculator uses the method explained on this page.

Reorder Point Calculator

Average demand (units per day): enter 0 or more. Prefilled example: 40.

Lead time, in days: enter 0 or more. Prefilled example: 7.

Safety stock (units): enter 0 or more. Prefilled example: 100.

How to use this calculator

Fill in the fields in this order; each step takes you to its field.

  1. Average demand (units per day): enter 0 or more.
  2. Lead time, in days: enter 0 or more.
  3. Safety stock (units): enter 0 or more.
  4. Read the result: Reorder point (units); the panel also shows Demand during lead time (units).

How this calculator works

Reorder point = average daily demand × lead time in days + safety stock. When stock on hand falls to this level, an order placed now should arrive just as the safety stock is reached.

Safety stock covers demand and delivery variation; a common way to size it is a service-level factor times the standard deviation of demand over the lead time.

The formula

  1. Ld=d×L
  2. Rop=Ld+ss
Symbols used in the formula
SymbolMeaningUnit
dAverage demandunits per day
LLead timedays
ssSafety stockunits
LdDemand during lead timeunits
RopReorder pointunits

Worked example

Average demand (units per day)40
Lead time7 days
Safety stock (units)100
Demand during lead time (units)280
  1. Ld=40×7=280
  2. Rop=280+100=380

Reorder point (units) 380

Each step uses the unrounded value of the step before it; figures on this page are rounded for display.

Frequently asked questions

What is the reorder point for 40 units a day, 7 days lead time and 100 units of safety stock?

380 units: 280 for the lead time plus 100 in reserve.

Does the reorder point tell me how much to order?

No. It tells you when; the order size comes from a separate rule such as economic order quantity.

Related calculators